Our Services

始终以翻译品质、物美价廉,提升您的翻译水准与品味为己任。

文档翻译
Document Translation

专注于法律合同、管理咨询、财经金融、机械制造、生物医药、IT通讯等领域的多语言翻译。

本地化翻译
Localized Translation

提供文档本地化、软件本地化、网站翻译、多媒体本地化、游戏本地化、多语言桌面排版(DTP)等服务。

口译服务
Interpretation Service

提供陪同翻译、会议翻译、会展口译、交替传译、同声传译,以及同传设备租赁等专业服务。

母语审校
Native-speaker Proofreaders

遍布全球的资深母语译员为您提供专业地道的润色审校服务,让您的译文更符合当地的文化习惯和文风要求。

Content

Thank you for buying WH Series high-power induction heating equipment.

In order to use the power supply correctly and prevent the hidden and unexpected accident in the future, please read the instruction carefully before installation and operation, and keep it properly for reference.

I. Preparation before installation. 2

II.Method of Installation. 5

III.Turn on and Operation. 7

IV.Operation Precautions. 7

V.Troubles and Settlements. 8

VI.Technical Parameters. 9

VII.Circuit Principle Frame. 10

VIII.Packing List of Equipment 10

I. Preparation before installation

1. Learn the Panel Function

These series equipment have two types according to frame---holistic type and separate type. There are many models according to different power for each kind. Please remember the relative panel functions by heart according to the frame and power model. 

Items in the picture WH-VI-16:

WH-VI-16 微型高频感应加热电源---WH-VI-16 mini-type high frequency induction heating power

功率调节---power control 减---reduce 增---increase 加热---heating 停止---stop 远控---remote control 开关---on and off 电源---power supply 加热---heating 电压---voltage 水压---hydraulic pressure 电流---current 水温---water temperature

Items in the picture WH-VI-26:

WH-VI-26 微型高频感应加热电源---WH-VI-26 mini-type high frequency induction heating power

功率调节---power control 减---reduce 增---increase 水温---water temperature水压---hydraulic pressure过流---over-current 过压---over-voltage 工作---work 电源---power supply远控---remote control 加热---heating 停止---stop 开关---on and off

Items in the picture WH-VIII-30BE:

高频感应加热设备--- high frequency induction heating equipment

振荡电流--- oscillating current 电源电压---power and voltage 缺相---open-phase水温---water temperature水压---hydraulic pressure过流---over-current 过压---over-voltage 工作---work 电源---power supply 电源开关---power switch 过流复位--- over-current restoration 手动自动---manual or automatic功率调节---power control 减---reduce 增---increase加热停止---heating and stop 远控---remote control 时间控制---time control 定时复位--- timing restoration

Items in the picture WH-VIII-50BE WH-VIII-80BE WH-VIII-120BE:

高频感应加热电源---high frequency induction heating power

缺相---open-phase水温---water temperature水压---hydraulic pressure过流---over-current 过压---over-voltage 工作---work 电源---power supply 功率调节---power control 减---reduce 增---increase远控---remote control 加热停止---heating and stop过流复位--- over-current restoration 控制开关---control switch

Name 

Function 

Display meter of power and voltage

Display the volts direct current.

Display meter of oscillating current

Under heating conditions it will fluctuate between 0-800. Under the stop condition, it shows 0. It shows the trend of power is high or low, increased or decreased.  

Power control button

Under heating condition adjust this button can accommodate the power to reach your requirement for heating temperature and speed. 

Alarm indicator lamp for water temperature

If this indicator lamp is on parts is too hot and water temperature is too high.

Alarm indicator lamp for hydraulic pressure

When the water pressure of the cooling water is too low or lacks water, this indicator lamp will be on.

Alarm indicator lamp for over-current 

When this indicator lamp is on the temperature is too high and Inter-turn short circuit occurs in the inductor. Please turn off the equipment and examine it immediately.

Alarm indicator lamp for over-voltage

When this indicator lamp is on the supply voltage exceeds the regulated range.

Heating and stop button 

Press it to heat and loosen it to stop.

remote control 

It is used to connect the remote control switch or foot switch to achieve remote control.

Over-current restoration

Release from the over current condition.

Power supply switch

This switch is the control power supply switch. Press it to switch on and loosen to switch off.

Manual and automatic

Turn on this switch can transform the manual or automatic condition.

Time control

Set the heating time(WH-30).

Time restoration

Press it to start timing again(WH-30).

Panel Function Table

2. Power supply requirement and wiring

Range of input voltage:

16KW-----single-phase: 180-240V  

26KW, 50KW, 80KW, 120KW, 160KW, 260KW-----three-phase four-wire system: 320-420V

Don’t connect in wrong way for of causing damaging to the equipment. While mains voltage exceeds limit, please don’t turn on the equipment.

Wire: These series products are of equipment with high power, so please ensure enough wire and reliable wiring to prevent the connection point from generating severe heat due to high contact resistance and joint current. Please choose specification of power cord referring to the following table 1. The power cord is a kind of copper core with withstands voltage 500V. 

Table 1

Model

WH-VI-16

WH-VI-26

WH-VIII-40

WH-VI-50

WH-VIII-80

WH-VIII-120

WH-VIII-160

WH-B-260

spec. of wire under voltage mm2

10

10

16

16

25

50

50

80

spec. of null line mm2

6

6

10

10

10

10

10

10

air-break switch

60A

60A

100A

100A

160A

200A

300A

500A

²       The equipment must be reliable earth connection according to the requirement. The frame must be reliable protective bonding to neutral. It is strictly prohibited to connect the ground wire with the water supply pipe. 

²       The line must be setting by the professional person according to the nation wiring rules. The power supply final stage must install relative air-break switch.

²       Please shut off the power cord when you don’t use the equipment.

3. Requirement for cooling water

The inner of equipment and inductor must be cooled down with clean water to prevent the cooling pipe from blocking. If the equipment supplies water with pump, please install filter screen at pump intake. Temperature of cooling water shall not be higher than 45℃ or it will lead to equipment alarm even overheating damage. Please see table 2 for detailed requirement.

 

Table 2

Model

self-sucking pump

Pipe diameter of required water hose

(inner)mm

Pull volume

(no less than)m3

Water pump power KW

lift/press(m/MPa)

WH-VI-16

0.55

20-25/0.2-0.3

10

3

WH-VI-26

0.55

20-25/0.2-0.3

10,25

4

WH-VIII-40

0.75

20-25/0.2-0.3

25

6

WH-VI-50

0.75

20-25/0.2-0.3

25

6

WH-VIII-80

1.1(three-phase)

20-25/0.2-0.3

25,32

10

WH-VIII-120

1.1(three-phase)

20-25/0.2-0.3

25,32

15

WH-VIII-160

1.1(three-phase)

20-25/0.2-0.3

25,32

15

WH-B-260

2.2(three-phase)

20-25/0.2-0.3

50,64

30

Inlet water temperature

Water quality

Hardness

Conductivity

Inlet water pressure

5-35℃

PH 7-8.5

No more than 60mg/L

Less than 500µA/cm3

1×105-3×105Pa

II.Method of Installation

Please install according to obvious marks on both sides of the panel. Please install according to the following sketch map if you have any problem. 

一体式:16KW、26KW、50KW安装示意图(2)

 

(1) 16KW 安装示意图:16 KW installation sketch map

(2) 一体式:16KW、26KW、50KW安装示意图:

Holistic type: 16KW, 26KW, 50 KW installation sketch map

(3)分体式: 80KW、120KW、160KW、260KW安装示意图 

Separate type: 80KW, 120KW, 160KW, 260 KW installation sketch map

1.感应器 inductor 2. 进水water inlet 出水water outlet 3. 接地connect to earth  4. 遥控开关/远控接口remote control interface 5.变压器 transformer

单相220V 50-60Hz: single-phase 220V 50-60Hz    三相 380V: Three-phase 380V

WH系列高频 WH Series high frequency  接漏电断路器:connect the residual current circuit breaker

 

1. Installation of inductor: For holistic type the inductor connect with secondary joint of main control tank directly; for separate please connect the inductor with transformer well and guarantee good contact. The interface of the transformer and inductor should have no water leakage.

2. Connection of cooling water: The inlet and outlet pipe should be connected reliably according to the tablet indication on the engine case. Please make sure that there are no wrong connection, aleak phenomena and seeper in chassis. Please do not sprinkle water into chassis. If it happens please cut off the power supply and drying it.       

3. Connect to earth: The frame must be reliable protective bonding to neutral with more than 6mm2 copper wires for three-phase four-line system. It should comply with the standard of electric work.

4. Please connect feet switch with the interface of remote control switch.

5. For separate type induction heating equipment please connect the main control tank with the transformer as the line number accordingly. Please connect the induction coil joint with the transformer secondary joint.

 

III.Turn on and Operation

 

1. Please choose appropriate induction coil according workpiece heated.

2. Turn on cooling water, examine flux and press of water to make sure them achieve required area. 

3. Turn on the power supply. It is single-phase 220V 50-60Hz for 16KW type and three-phase 380V  50-60Hz for others.

A Open the control switch of the front panel of the equipment and switch on power supply.

I Put the workpiece into the induction coil and then step on the feet switch to start heating.

II Adjust the power control knob to make the heating speed achieve technics requirement.

III Loosen the feet switch after heating finish and then take out the workpiece.

IV Stop heating and close power supply switch and the air-break switch on the switchboard after all    completed. 

a Turnoff the cooling water after 10 minutes.

b

c

d

 

IV.Operation Precautions

 

1. Please ensure the casing connects to earth in accordance with the standard of electric work to prevent from electric shock.

2. Dismantle and installation of inductor must be done after stopping heating.

3. Firstly connect the equipment with water and then connect it with power. The inner of equipment and inductor must be cooled down with clean water to prevent the cooling pipe from blocking. If the equipment supplies water with pump, please install filter screen at pump intake. Temperature of cooling water shall not be higher than 37℃ with water flux 10T/h (It is better to use intenerated water), or else will lead to equipment alarm even overheating damage.

4. The equipment must be avoided insolation, drench, dampness and dust. Please carry the serving and maintenance after power off one hour.  

5. Please make sure the induction coil is clean to avoid short circuit between the turns of inductors.

6. The equipment cannot use loop inductor, which will make inductive reactance too low and lead to damage of equipment. Under special circumstance, please consult with manufacturer.

7. The cooling water must be clean without impurity. It is prohibited to be short of water under work condition. Please set a filter at the entrance of suction stroke.

8. Descale the waterway of equipment with the detergent (we supply it) every four months. Please clean immediately when the alarm indicator lamp for water temperature is on frequently or water current from the out water gap is decreased patently.

9. Clean the inner of equipment: Blow it clean with compressed air or blowing machine. Clean the circuit board with brush and then blow it. 

10. Inductor connect board must be polished with a sand paper to keep good electrical conductivity if you replace inductor.

V.Troubles and Settlements

Troubles

Possible reasons

Settlements

No power indication

1.Bad contact of power supply switch on the panel

2.1A protective tube broken

3.open-phase

1. Close and open ,do several times

2.Change a new 1A protective tube

3.Check the power voltage

Work lamp is not on after operating the feet switch

1.Feet switch down-lead falls off

2.AC contactor pull-in failure or with bad contact

3.Inductor with bad contact

Examine feet switch, AC contactor or inductor

No current indication or little after turn the panel power to maximum

1.Too many turns of inductor or too much load

2.Inductor with short circuit

3.Inductor with bad contact

4.Inner insert is loose or bolt is loose

1.Change a new inductor

2.Restart

3.Polish joint or acid wash

Workpiece cannot be heated after putting in 

1.The capacity of out power supply is too small or the line is too thin

2.Open-phase

3.Too many turns of inductor or too much load

4.Half bridge condition

1.Increase power supply capacity

2.Examine three-phase power supply

3.Change a new inductor

4.Contact with manufacturer

Over current alarm

1.Inductor with bad contact or short circuit

2.AC contactor with bad contact

3.turns of inductor are overmany or less

4.there is spark at the joint of out power supply

5.High frequency cable with bad contact

6.power board is broken

7.there is spark in inner

8.Syntonic transformer is broken

1.Examine inductor, high frequency cable and out power supply

2.Change a new AC contactor

3.Reduce turns of inductor

4.Examine power tube

water pressure alarm

1.Water press is too low

2.scale block

3.water press switch is broken

1.increase water pressure

2.Cleanout the scale

3.Change a new switch

water temperature alarm

1.Water temperature is too high

2.water flux is too small

3.Water pipe jam

4.much scale

5.water temperature relay broken

1.Change cooling water

2.Increase pump or water press

3.Use the detergent  with proportion of 1:40 to clean

4.Change a new water temperature reply

Over voltage alarm

The over voltage indication lamp is on, which indicates voltage is higher than 420V. The machine stops working automatically.

Deal with mains voltage

Open-phase alarm

lead-in power supply open-phase

Check the lead-in power supply

 

VI.Technical Parameters

 

Model

WH-VI-16

WH-VI-26

WH-VIII-40

WH-VIII-50

WH-VIII-80

WH-VIII-120

WH-VIII-160

WH-B-260

Input power

16KVA

26KVA

40KVA

50KVA

80KVA

120KVA

160KVA

260KVA

Input  voltage

Single-phase

220V 50-60HZ

Three-phase

380V 50-60 HZ

Three-phase

380V 50-60 HZ

Three-phase

380V 50-60 HZ

Three-phase

380V 50-60 HZ

Three-phase

380V 

50-60 HZ

Three-phase

380V 

50-60 HZ

Three-phase

380V 50-60 HZ

Oscillating

frequency

30-50KHZ

30-50KHZ

15-30KHZ

15-30KHZ

15-28KHZ

15-25KHZ

15-25KHZ

15-20KHZ

Infall hydraulic pressure

≥0.05MPa

≥0.05MPa

≥0.05MPa

≥0.05MPa

≥0.05MPa

≥0.0

VII.Circuit Principle Frame

控制单元:Control cell驱动单元:Drive cell

显示单元:Display cell 启动:Start 停止:Stop 电源:Power supply 工作:Work 过流:Over current 缺水:Lack water 过热:Over hot 过压:Over voltage 输出电流显示:Output currency display

VIII.Packing List of Equipment

1. Control tank, one set 2. A set of transformer tank (Separate) 3. Three inductors 4.Instruction book    5. Certificate of competency 6. Warranty card

相关阅读 Relate

翻译模板相关问答
问:如果翻译的稿件只有几百字,如何收费?
答:对于不足一千字的稿件,目前有两种收费标准: 1)不足一千字按一千字计算。 2)对于身份证、户口本、驾驶证、营业执照、公证材料等特殊稿件按页计费。
问:请问贵司的笔译范围?
答:笔译翻译又称人工笔头翻译, 既通过文字形式的翻译转换, 把源语言翻译成目标语言, 是当今全球经济发展, 政治文化交流的主要方式, 笔译通过文字展现方式, 使全世界上千种语言能够互通有无, 每天都有数以亿计的文字被翻译或转译, 笔译肩负着世界各国经济文化发展的重任, 是各国各民族的文化大使, 我们的笔译领域涉及十大类专业领域和五百多种不同的分领域。
问:是否可以请高校教师、学者或学生翻译?
答:绝对不能,风险自负。许多公司在寻找译者时,首先想到的是当地学校或大学的外语院系。有时,这种做法对于供内部使用的翻译可能有效,即,您只想了解文件大意,但对于正式的公司宣传材料、手册或者合同文档而言,这样做却风险极大。外语教学需要有特殊的技能,但这些技能却与翻译一篇流利、优美的文章所需的技能完全不同。让学生来做翻译看起来经济实惠,但风险更高,因为他们毫无实战经验,翻译出来的文件基本无法使用。
问:翻译交稿时间周期为多长?
答:翻译交稿时间与您的文件大小以及复杂程度有关。每个专业译者的正常翻译速度为3000-4000中文字/天,对于加急的大型项目,我们将安排多名译员进行翻译,由项目经理将文件拆分成若干文件,分配给不同的译员进行翻译,翻译后由项目经理进行文件的合并,并经统一术语、审校、质控、排版等翻译流程,最终交付给客户。
问:提供一个网站的网址,能够给出翻译报价吗?
答:对于网站翻译,如果您能提供网站的FTP,或您从后台将整个网站下载打包给我们,我们可在10分钟内给出精确报价。同时,只要您提供原始网页文件,我们会提供给您格式与原网页完全一致的目标语言版本,可以直接上线使用,省却您的改版时间。
问:为什么标点符号也要算翻译字数?
答:①根据中华人民共和国国家标准GB/T 19363.1-2003 对翻译行业服务规范的要求,中文字数统计是以不计空格字符数为计算单位的。标点符号算翻译字数是统一的行业标准。 ②标点符号在不同的语种中,有不同的表达方式,例如中文的标点符号大多是全角的,英文的无特殊设置都是半角的,而且如果一句话或一段内容夹杂两种不同的语言,标点符号的规则就相对复杂,对于翻译文件来说,标点符号的部分也是很费时。 ③另外,标点符号在句子中对句子语境等的限制因素,使得标点对句子、对译员翻译判断等起到一定的要求。所以,该部分也要计算在内。 ④可能我们平时不是很注重标点符号,其实在文字表达中,标点符号的重要不亚于单字单词,一个标点符号可以改变全句话的意思,而我们的工作也是做到了这一点,保证每个标点符号的准确,保证译文表达的意思和原文一样。
问:需要与你们公司什么人接洽翻译业务呢?
答:我们公司采取专属客服服务模式。为企业客户配备专属客服,一对一沟通具体翻译需求,组建专属译员团队。
问:为何每家翻译公司的报价不一样?
答:大家都知道一分价格一分货,在翻译行业里更为突出,译员的水平是划分等级的。新开的翻译公司或不具备翻译资质的公司为了抢占市场,恶意搅乱,以次充好,低价吸引客户。
问:为什么数字、字母也要算翻译字数?
答:根据中华人民共和国国家标准GB/T 19363.1-2003 对翻译行业服务规范的要求,中文字数统计是以不计空格字符数为计算单位的。而数字、字母也是包含在其中。而对翻译公司来说,数字和字母也要算翻译字数的原因还包括以下两个方面: 首先,我们的收费都是根据国家颁布的翻译服务规范来收取翻译费用,对待收费我们都是统一对待的,其次,数字和字母也是文章中的一部分,特别是在一些商务文件中,数字就是文件的主题,所以也是一样要收费的。 另外,纯数字字母需要核对、录入,比翻译一个词语更麻烦,翻译是大脑里面概念形成的,而纯数字字母是要严谨的核对、录入才能实现的,这将会花费更多的时间,所以我们会把数字和字母也算成字数。 但是有一种情况除外,如审计报告里面那种数据很多而且又不需要我们翻译可以直接保留的,这部分我们可以不计算在内。
问:请问贵司每天的翻译量是多少?
答:我们公司最高翻译记录为一天翻译50万字。原则上我们会在约定的时间内完成,但是时间和质量是成正比的,慢工才能出细活,我们建议在时间允许的情况下,尽量给译员充足的翻译时间,以便交付优质的译文。
本站部分内容和图片来源于网络用户和读者投稿,不确定投稿用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的权利,请联系:187348839@qq.com,及时删除。
Go To Top 回顶部
  • 扫一扫,微信在线