Our Services

始终以翻译品质、物美价廉,提升您的翻译水准与品味为己任。

文档翻译
Document Translation

专注于法律合同、管理咨询、财经金融、机械制造、生物医药、IT通讯等领域的多语言翻译。

本地化翻译
Localized Translation

提供文档本地化、软件本地化、网站翻译、多媒体本地化、游戏本地化、多语言桌面排版(DTP)等服务。

口译服务
Interpretation Service

提供陪同翻译、会议翻译、会展口译、交替传译、同声传译,以及同传设备租赁等专业服务。

母语审校
Native-speaker Proofreaders

遍布全球的资深母语译员为您提供专业地道的润色审校服务,让您的译文更符合当地的文化习惯和文风要求。

  METAL BUILDING SYSTEM SUPPLY CONTRACT

轻钢结构建筑材料供应合同翻译模板(中英文)

  合同编号: Contract No: _____

  买方 (以下简称买方) Buyer: (hereinafter, the Buyer)

  地址: Address : 电话Tel : 传真Fax :

  卖方:(以下简称卖方) Seller: (hereinafter, the Seller)

  地址: Address : 电话Tel : 传真Fax :

  本合同经买、卖双方友好协商后在 年 月 日签订。根据本合同签订的条款,买方同意向卖方购买、卖方同意向买方提供下列轻钢结构系统建筑材料一套(以下简称钢结构):

  This Contract is made by and between the Buyer and Seller on ______ after friendly negotiations. The Buyer hereby agrees to purchase from the Seller, and the Seller hereby agrees to sell to the Buyer, the following set of metal building system (hereinafter, the Metal Building System) on the terms and conditions set forth in this Contract:

  第一条 项目名称Article 1. Name of Project

  1.1 本项目名称为:The name of this project is:

  1.2 本项目位于 (以下简称工地现场)。

  This project is located at (hereinafter, the Site).

  第二条 卖方供货范围 Article 2. Scope of Supply from Seller

  2.1 在提供钢结构时,卖方应负责:

  In supplying the Metal Building System, the Seller shall be responsible for:

  2.1.1设计并制造供应本项目地面以上的全部钢结构(详见附件一);及

  the design and manufacture of this project’s entire above-ground structure (see Attachment 1 for details); and

  2.1.2所提供钢结构部件及材料的 □必要包装 □运输 □运输的保险。

  the necessary packing □shipping □shipping insurance□of and for the parts and materials of the Metal Building System being supplied.

  第三条 合同价格Article 3. Contract Price

  3.1 本合同总价为人民币 整(以下简称合同总价)。

  The price of this Contract is Rmb (hereinafter, the Contract Price ).

  3.2 合同总价不包含有关之 □关税 □增值税。

  The Contract Price excludes the related customs duty □ value added taxes □.

  第四条 付款条件及方式Article 4. Payment Terms

  4.1 本合同签订后五个工作日内,买方应付予卖方合同总价之20 %作为定金,即人民币: 元。

  Within 5 working days of the signing of this Contract, the Buyer shall pay to the Seller a deposit equal to 20% of the Contract Price, i.e. Rmb .

  4.2 买方收到卖方的钢结构设计图并确认后三个工作日内,应付予卖方合同总价之20 %作为预付款,即人民币 元。

  Within 3 working days of its receipt and approval of the design drawings for the Metal Building System, the Buyer shall pay to the Seller a prepayment amount equal to 20% of the Contract Price, i.e. Rmb .

  4.3 钢结构制造完成后,并经买方验收后五个工作日内,买方应付予卖方合同总价之60%,即人民币 元。

  Within 5 working days after the manufacture of the Metal Building System has been completed and the Buyer has accepted the Metal Building System, the Buyer shall pay to the Seller 60% of the Contract Price, i.e. Rmb .

  4.4 买方支付卖方的所有款项均以银行汇票或电汇方式汇至卖方指定在 银行所开之帐号,号码086861-10224020560。所有付款日期均以卖方收款之银行收款凭证日期为准。如买方逾期五天付款,须从第六天起按日支付该笔逾期款项0.1%的滞纳金。若买方之逾期付款超过应付款日三十天后,卖方有权单方面取消整个合同,并没收买方已支付之定金、预付款和其他款项作为赔偿。若该笔款项不足弥补卖方之损失,则买方还需就不足部分支付赔偿金。

  All payments to be made by the Buyer to the Seller hereunder shall be made by bank draft or wire transfer to the Seller’s designated account at Bank , account No. 086861-10224020560. The date of payment for all amounts shall be the official date of receipt by the seller’s receiving bank. If the Buyer’s payment is late for five days,it shall pay a penalty on the late sum from the sixth day at a rate of 0.1% per day. If the Buyer’s payment is late for more than 30 days, the Seller has a right to unilaterally terminate this Contract and forfeit the deposit, prepayment and any other sums as compensation . If such sums are not sufficient to compensate the Seller’s losses, the Buyer shall pay the Seller the amount of such deficiency.

  第五条 设计、制造进度及期限Article5. Progress and Time Limit on Design and Manufacture

  5.1 卖方收到定金后四周内,应向买方提供设计所需的反力图及地脚螺栓布置图。买方应尽快将以上资料提交负责设计地基和基础的设计院。有关设计院的所有费用(包括图签费用)均由买方承担。

  Within four weeks after it received the deposit, the Seller shall provide to the Buyer the reaction drawings and the drawings for the placement of the anchor bolts required for the design of the Metal Building System. The Buyer shall give this information to the design institute responsible for the design of the foundation as soon as possible. All costs related to the design institute (including the cost of signing the drawings) shall be borne by the Buyer.

  5.2 收到预付款后 周,卖方应完成钢结构制造并通知买方派员到卖方工厂进行交货发运前检验。

  Within weeks after it received the prepayment, the Seller shall complete the manufacture of the Metal Building System and notify the Buyer to send its representative to the Seller’s plant to inspect the goods before their delivery and shipment.

  5.3 买方验收后已付卖方第4.3条货款后一周内,卖方应将产品运至工地现场。

  Within one week after the Buyer has inspected and accepted the goods and paid Seller the amount set forth in article 4.3 hereof, the Seller shall have the goods shipped to the Site.

  5.4 买方若要求变更钢结构规格或设计,应以书面方式通知卖方,卖方在可能的情况下尽量满足买方要求,但卖方可视增加之工时和材料调整本合同价格及期限,经买卖双方同意后才生效。所有钢结构规格或设计之变更,若因买方未能于两天内签署卖方所提供的有关确认文件,均视为买方取消变更要求,恢复原本规格或设计。如因此而造成钢结构设计或制造之延误,则买方须承担一切责任。

  Should the Buyer request any changes to the specifications or design of the Metal Building System, it shall notify the seller in writing. The Seller shall try to satisfy the Buyer’s request as best as possible, but may adjust the Contract Price or the time frame for performance based on the additional amount of work, time and materials required as a result of such changes. Such adjustments shall be effective upon agreement by both the Buyer and the Seller. If the Buyer shall fail to sign the relevant confirmation provided by the Seller relating to such adjustments within 2 days thereof , such adjustments shall be deemed to be cancelled by the Buyer. The Buyer shall not be responsible for any delays in the design or manufacture of the Metal Building System as a result thereof.

  5.5 除天灾人祸等不可抗力因素及因买方未尽本合同责任之情形以外,如卖方逾期完成以上任何一项义务,须从逾期第四天起按日支付该笔逾期款项0.1%的罚款,但该罚款不应超过本合同总价之3%。

  Except for force majeure or a failure by the Buyer to perform its obligations under this Contract, if the Seller fails to complete on time any of its tasks set forth above, it shall pay a penalty of 0.1% per day on the late amount, commencing on the fourth day of such delay, provided that such penalty shall not exceed 3% of the Contract Price.

  5.6 第5.2及5.3条所提到的交货时限是以买方在收到钢结构设计图后七天内把确认图还给卖方和买方在收到验收通知后七天内派员到卖方工厂进行货物检验为根据。买方每逾期一天确认设计图或到卖方工厂验货,无论什么原因,卖方的交货时限会延迟两天,如该逾期超过七天,卖方有权根据其当时的业务要求重新安排交货时间。

  The delivery schedule referred to in Sections 5.2 and 5.3 hereof is subject to the Purchaser returning the approved design drawings to the Seller within 7 days of receipt thereof and inspecting the goods at Seller’s plant within 7 days of notice thereof from the Seller. Each day of delay in the return of such approved drawings to the Seller or such inspection of the goods, for whatever reasons, will result in a two-day postponement of the date of delivery. If any such delay shall exceed 7 days, the Seller shall be entitled to re-schedule the delivery date based on its then existing business commitments.

  5.7 买方应赔偿或补偿卖方因买方造成的交货延误所受到的所有损失,包括(但不限于)货物贮存的费用,该费用以每天每吨人民币83元计算。

  The Purchaser shall indemnify the Seller for all costs incurred by it as a result of any delay in the delivery of the Metal Building System caused by the Purchaser, including, without limitation, the cost of storage which shall be charged at the rate of Rmb 83 per ton per day.

  第六条 装运和清点Article 6. Packing, Shipping and Inventory

  6.1 钢结构制造完毕、经买方验收后方能装运到工地现场。卖方应提前一周前通知买方其发运日期以便买方为卖方提供工作条件上的方便,例如提供现场物资存放的道路、场地及水电供应等。

  The Metal Building System may be packed and shipped to the Site only after the manufacture of the Metal Building System is completed and the Buyer has inspected and accepted the goods. The Seller shall notify the Buyer one week in advance of the shipment date so that the Buyer can provide the working convenience for the Seller, such as the roads and place for the storage of the goods and water and electricity, etc.

  6.2 货物到达工地现场后,买方应即时清点及验查货物质量并签收。如有损坏,买方应即时通知卖方。

  After the goods arrived at the Site, the Seller shall immediately inventory and inspect the quality of the goods and accept them. If there is any damage thereto, the Buyer shall immediately notify the Seller.

  6.3 工地现场的卸货由买方负责,如有延误,所有费用由买方负责。

  The Buyer shall be responsible for the unloading of the goods at the Site. The costs of any delays shall be borne by the Buyer.

  第七条 产品检验Article7. Inspection of Goods

  7.1 如在验收过程中,买方发现货物的质量、规格、性能与合同不符合,卖方可按买方的要求退换或修复,达到合同要求。如有争议,买方可申请上海进出口商品检验局就产品质量、规格及性能进行检验,所有费用由买方承担。

  If during the course of inspection the Buyer discovers that the quality, quantity, specifications of nature of the goods do not meet with the requirements in the Contract, it may request to return the goods or have them repaired or replaced so as to meet the requirements in the Contract. If there is any dispute, the Buyer may apply to have Shanghai Import & Export Commodity Inspection Bureau to inspect the quality, quantity, specifications and nature of the goods. All costs related thereto shall be borne by the Buyer.

  第八条 卖方声明和保证Article 8. Seller’s Representations and Warranties

  8.1 卖方对产品质量作出下列声明及保证:

  The Seller makes the following representations and warranties with respect to the quality and quantity of the goods:

  8.2 钢结构设计以美国Metal building Members Association (MBMA) 建筑规范 (1986年版)及相关技术文本为标准。

  The design of the Metal Building System is based on the building codes of the Metal Building Members Association (MBMA) of the United States of America (1986 Edition) and related technical documents.

  8.3 卖方对产品的质量保证期为一年,在产品送达工地现场一年内,如产品在正常操作情况下出现质量问题,卖方会免费提供维修服务。此产品质量保证不包括因买方不当处置产品引致之问题或原材料引致之间接损失或随之发生的损害。

  The Seller’s warranty on the goods is one years. If the goods develop problem during normal operation within one years. of its arrival at the Site, the Seller shall provide free repair service. This warranty does not cover any problems caused by the mishandling of the goods by the Buyer or indirect losses caused by the raw materials or any consequential damages.

  第九条 技术资料和单据Article 9. Technical Information and Receipts

  9.1 卖方应在产品送达工地现场一周前,把下列技术资料交给买方:

  9.1.1由制造厂发出产品说明书一份;和

  9.1.2施工图一式三份。

  Within one week of the delivery of the goods to the Site, the Seller shall provide the following technical information to the Buyer:

  9.1.1 A copy of the product description issued by the manufacturer; and

  9.1.2Three copies of the construction drawings.

  9.2 卖方应于卖方在产品运出后,把下列单据交给买方:

  9.2.1税务发票,内容注明本合同编号、项目名称等;

  9.2.2交货清单一式四份;

  9.2.3制造厂签发的质量证明书;和

  After the goods have been shipped ,the Seller shall provide the Buyer with the following invoices and receipts:

  9.2.1A tax receipt, the content of which shall include the number of this Contract, the name of the project, etc.

  9.2.2 Four copies of the inventory list of the goods delivered;

  9.2.3 The quality and quantity certificate issued by the manufacturer; and

  第十条 不可抗力Article10. Force Majeure

  10.1 买卖双方中任何一方,由于人力不可抗力事故而影响合同执行时,则延迟履行合同的期限,延迟的时间相当于事故所影响的时间,受事故影响一方应于事故发生后三天内将所发生的不可抗力事故的情况用传真方式通知对方,并在十天内递交有关证明文件给另一方确认。当不可抗力事故终止后,受事故影响的一方应于事故终止后三天内用以传真方式通知对方,并以信件证实。任何不可抗力事故影响合同执行超过12周以上的,双方应应合同执行的有关问题进行协商。

  If the performance of the Buyer or Seller under this Contract is affected by a force majeure, then the period for such performance shall be postponed during the duration of such event. The affected party shall notify the other party by fax within 3 days of the occurrence of such event and shall provide the other party evidence of such event within 10 days of the occurrence of such event. After the force majeure event has terminated, the affected party shall notify the other party by fax within 3 day after the termination of such event followed by a latter to evidence such termination. The parties shall discuss the problems of this Contract if any force majeure event shall affect such performance for more than 12 weeks.

  10.2 不可抗力事故包括任何预料之外事件,如战争、叛乱、暴动、骚动、火灾、罢工、自然灾害、禁运及任何其他卖方控制范围以外之事件。

  For purposes hereof, force majeure means any unforeseeable event, such as war, insurrection, mob action, civil commotion, fire, strike, natural disaster, embargo and any other event outside the control of the Seller.

  第十一条 仲裁Article 11. Arbitration

  11.1 凡因执行本合同所产生的或与本合同有关的一切争议,双方应通过友好协商解决,如协商不成,任何一方可提交上海市经济贸易仲裁委员会进行仲裁,仲裁裁决是最终的,对双方都有约束力。仲裁费用由败诉方承担。

  All disputes arising out of or in connection with this Contract shall be resolved by the parties through friendly negotiations . If the parties are unable to resolve such disputes, either party may submit such disputes to arbitration by the China International Economic and Trade Arbitration Commission, which arbitral award shall be final and binding on both parties. The costs of arbitration shall be borne by the losing party.

  第十二条 其他条款Article12. Other Provisions

  12.1 本合同经双方签字及盖章后生效。买卖双方之所有责任和义务完毕时,本合同自然终止。

  This Contract shall be effective after both parties have signed and sealed it. When the duties and obligations of the Buyer and Seller are completed, this contract shall automatically terminate.

  12.2 本合同的附件为本合同不可分割之组成部分,与本合同具有同等法律效力。

  The appendices to this Contract constitute an inseparable part of this Contract and shall have the same legal effect of this Contract.

  12.3 本合同包含双方所有谈判内容及协商的条款,并取代双方以往对合同项目的一切协议。

  This Contract sets forth the entire understanding and agreement of the parties and shall supersede all prior agreements between the parties with respect to the project set forth in this Contract.

  12.4 本合同正本一式四份,由买卖双方各执二份。

  This Contract has four counterparts, the Buyer and the Seller each to have two counterparts.

  买方:Buyer: 卖方:Seller:

  法定代表或授权人(签名): 法定代表或授权人(签名):

  Legal Representative or Proxy (Signature): Legal Representative or Proxy (Signature):

  合同附件Appendix

  设计及材料说明Design & Materials Specification

  1. 主框架:Main Frame:

  所有钢性框架为焊接成型的变截面I形柱、梁;所有端墙屋面梁和端墙柱根据设计要求同样选择组合焊接I型变截面,设计时根据AISC1989年6月1日版的钢结构建筑规范中允许应力设计及塑性应力设计:

  All rigid frames will be welded, built-up I sections. The columns and the rafters will both select welded, built-up I according to design requirements The design will be in accordance with the stress design and plastic stress design permitted by AISC’s June 1, 1989 edition of Specification for Structural Steel Buildings.

  所有底板,拼接板,盖板和加强板应在工厂焊接到结构构件上;螺栓孔以及所有底板,拼接板和翼缘板均在工厂预制,并打好螺栓连接孔;腹板的工厂预制包括对拉杆支撑及翼缘支撑的冲孔定位。

  All base plates, splice plates, cap plates, and stiffeners will be welded into place on the structural parts in the factory. Anchor bolt openings and all base plates, splice plates and flanges will be pre-fabricated at the factory and include bolt connection holes. Webs will be shop fabricated to include cable brace and rod brace holes and flange brace holes.

  组合焊接截面钢材的材质相当于___钢;钢支架制作完毕后表面喷砂除锈,表面再涂覆醇酸快干底漆。

  The quality of steel for all built -up sections will be the same as ____. After the frame is manufactured , injecting sand and undusting from the face, then cover coats.

  2. 次结构:Substructure:

  檩条和围梁为冷弯Z型或 C 型薄壁型钢,并在翼缘设置加强件,工厂加工时预先冲孔,以便于在现场将其与主框架用螺栓连接起来,檐口支撑为翼缘宽度不等的冷弯C型材。

  Purlins and girts should be cold-formed Z or C sections with stiffened flanges. They will be pre-punched at the factory to provide for field bolting to the primary framing. Eave struts should be unequal flange, cold -formed C sections.

  3. 支撑:Bracing:

  屋面和边墙的对角斜支撑用于传递结构的纵向荷载(风荷载、吊车荷载等),该撑条整条加工,两端配有斜面垫圈和螺帽,支撑条是两端有螺纹的拉杆,翼缘支撑中所有主框架的受压翼缘均用角钢侧向支撑至檩条或墙梁的腹板,以便翼缘压应力在任何荷载组合条件下均不超出充许极限;边墙不许设置对角斜支撑的部位(因为门窗或开孔的缘故),用门式网性框架、固定式柱脚、或具有斜支撑作用的墙体来代替,屋面或边墙的板材具有充分的斜向支撑强度,并能保证抵抗风荷载,则考虑不设置屋面或墙体斜支撑。

  Diagonal bracing in the roof and sidewall will be used to remove longitudinal loads form the structure. This bracing will be furnished to length and equipped with bevel washers and nuts at each end .It may consist of rods threaded each end or galvanized cable with suitable threaded end anchors. The compression flange of all primary framing will be braced laterally with angles connection to the webs of purlins or girts so that the flange compressive stress is within allowable limits for any combination of loadings. When diagonal bracing is not permitted in the sidewall, a rigid frame type portal, fixed base columns, or wall diaphragm must be used. Wind bracing in the roof and /or walls need not furnished where it can be shown that the diaphragm strength of the roof and/or wall covering is adequate to resist the applied wind forces.

  4. P.V.D.F.涂层P.V.D.F. Painting

  外墙板在冷轧钢板表面镀铝锌合金镀层后,表面再作热漫预处理,上底漆后,外表涂P.V.D.F.面漆(属Kynar 500系列产品),整个涂层干膜的厚度为27~30微米。

  The wall Panel should be aluminum-zinc alloy-coated cold-formed steel. The base metal shall be pretreated and then primed with primer. The exterior side shall be given P.V.D.F. coating (Kynar 500). All the dry film thickness shall be 27~30µm.

  5. S.M.P.涂层S.M.P. Coating

  内墙板在冷轧钢板表面镀铝锌合金镀层后,表面处理后,再加以烘烤,最后再涂覆上耐候性极佳的特殊强化聚脂(Special Modified Polyester), 这些措施可保证铝锌色板在经过多年的风雨侵蚀后不产生褪色、剥落现象。

  The interior wall panel should be aluminum-zinc alloy-coated cold-formed steel. The base metal should be pretreated and baked, then given the Special Modified Polyester which has excellent weatherability. These can protect the aluminum-zinc alloy-coated steel from fading and spalling by weathering.

  6. 其他零星材料说明Miscellaneous Material Specifications

  6.1 紧固件Fasteners

  6.1.1结构螺栓:所有用于主结构拼接和次结构相接处的螺栓,都根据设计要求选用。

  Structural Bolts: All bolts used in primary splices and secondary framing connections will be as required by design.

  6.1.2屋面板和墙面板紧固件:所有屋面板与次结构的联结都选用由碳钢制成的自攻螺丝,该螺丝带锌合金压模或不锈钢铸造而成的杯状六角垫圈螺帽,屋板紧固件配有垫圈,此类紧固件涂有彩色漆,以永久涂层系统相配,该自攻螺丝为进口。

  Fasteners for Roof Panels and Wall Panels: All the connections for Roof Panel and Substructure will be self-drilling carbon steel screws with a molded zinc alloy or capped stainless steel cupped hex washer head. Roof fasteners will be assembled with washer. The wall fasteners will be color coordinated with a premium coating system. The self-drilling steel screws will be imported.-drilling steel screws will be imported.

相关阅读 Relate

  • 西班牙语合同翻译用词准确严谨
  • 法律合同的完整性是翻译的重要因素
  • 合同翻译的专业性和精确性
  • 行业新闻相关问答
    问:如果翻译的稿件只有几百字,如何收费?
    答:对于不足一千字的稿件,目前有两种收费标准: 1)不足一千字按一千字计算。 2)对于身份证、户口本、驾驶证、营业执照、公证材料等特殊稿件按页计费。
    问:请问贵司的笔译范围?
    答:笔译翻译又称人工笔头翻译, 既通过文字形式的翻译转换, 把源语言翻译成目标语言, 是当今全球经济发展, 政治文化交流的主要方式, 笔译通过文字展现方式, 使全世界上千种语言能够互通有无, 每天都有数以亿计的文字被翻译或转译, 笔译肩负着世界各国经济文化发展的重任, 是各国各民族的文化大使, 我们的笔译领域涉及十大类专业领域和五百多种不同的分领域。
    问:是否可以请高校教师、学者或学生翻译?
    答:绝对不能,风险自负。许多公司在寻找译者时,首先想到的是当地学校或大学的外语院系。有时,这种做法对于供内部使用的翻译可能有效,即,您只想了解文件大意,但对于正式的公司宣传材料、手册或者合同文档而言,这样做却风险极大。外语教学需要有特殊的技能,但这些技能却与翻译一篇流利、优美的文章所需的技能完全不同。让学生来做翻译看起来经济实惠,但风险更高,因为他们毫无实战经验,翻译出来的文件基本无法使用。
    问:翻译交稿时间周期为多长?
    答:翻译交稿时间与您的文件大小以及复杂程度有关。每个专业译者的正常翻译速度为3000-4000中文字/天,对于加急的大型项目,我们将安排多名译员进行翻译,由项目经理将文件拆分成若干文件,分配给不同的译员进行翻译,翻译后由项目经理进行文件的合并,并经统一术语、审校、质控、排版等翻译流程,最终交付给客户。
    问:提供一个网站的网址,能够给出翻译报价吗?
    答:对于网站翻译,如果您能提供网站的FTP,或您从后台将整个网站下载打包给我们,我们可在10分钟内给出精确报价。同时,只要您提供原始网页文件,我们会提供给您格式与原网页完全一致的目标语言版本,可以直接上线使用,省却您的改版时间。
    问:为什么标点符号也要算翻译字数?
    答:①根据中华人民共和国国家标准GB/T 19363.1-2003 对翻译行业服务规范的要求,中文字数统计是以不计空格字符数为计算单位的。标点符号算翻译字数是统一的行业标准。 ②标点符号在不同的语种中,有不同的表达方式,例如中文的标点符号大多是全角的,英文的无特殊设置都是半角的,而且如果一句话或一段内容夹杂两种不同的语言,标点符号的规则就相对复杂,对于翻译文件来说,标点符号的部分也是很费时。 ③另外,标点符号在句子中对句子语境等的限制因素,使得标点对句子、对译员翻译判断等起到一定的要求。所以,该部分也要计算在内。 ④可能我们平时不是很注重标点符号,其实在文字表达中,标点符号的重要不亚于单字单词,一个标点符号可以改变全句话的意思,而我们的工作也是做到了这一点,保证每个标点符号的准确,保证译文表达的意思和原文一样。
    问:需要与你们公司什么人接洽翻译业务呢?
    答:我们公司采取专属客服服务模式。为企业客户配备专属客服,一对一沟通具体翻译需求,组建专属译员团队。
    问:为何每家翻译公司的报价不一样?
    答:大家都知道一分价格一分货,在翻译行业里更为突出,译员的水平是划分等级的。新开的翻译公司或不具备翻译资质的公司为了抢占市场,恶意搅乱,以次充好,低价吸引客户。
    问:为什么数字、字母也要算翻译字数?
    答:根据中华人民共和国国家标准GB/T 19363.1-2003 对翻译行业服务规范的要求,中文字数统计是以不计空格字符数为计算单位的。而数字、字母也是包含在其中。而对翻译公司来说,数字和字母也要算翻译字数的原因还包括以下两个方面: 首先,我们的收费都是根据国家颁布的翻译服务规范来收取翻译费用,对待收费我们都是统一对待的,其次,数字和字母也是文章中的一部分,特别是在一些商务文件中,数字就是文件的主题,所以也是一样要收费的。 另外,纯数字字母需要核对、录入,比翻译一个词语更麻烦,翻译是大脑里面概念形成的,而纯数字字母是要严谨的核对、录入才能实现的,这将会花费更多的时间,所以我们会把数字和字母也算成字数。 但是有一种情况除外,如审计报告里面那种数据很多而且又不需要我们翻译可以直接保留的,这部分我们可以不计算在内。
    问:请问贵司每天的翻译量是多少?
    答:我们公司最高翻译记录为一天翻译50万字。原则上我们会在约定的时间内完成,但是时间和质量是成正比的,慢工才能出细活,我们建议在时间允许的情况下,尽量给译员充足的翻译时间,以便交付优质的译文。
    本站部分内容和图片来源于网络用户和读者投稿,不确定投稿用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的权利,请联系:187348839@qq.com,及时删除。
    Go To Top 回顶部
    • 扫一扫,微信在线